Skip to form
SeamlessDocs




We would like your feedback on the Exit 21 improvement project. Please review the project information below and the click the "NEXT" icon to proceed to the survey.



Existing Conidtions and 2040 No Build Projection: After conducting traffic counts during Summer 2019, Kittelson and Associates found poor levels of service (LOS) at the intersations around Exit 21. LOS A-B indicates an average wait time of 20 seconds or less, LOS C-D indicates an average wait time of 20-55 seconds, and LOS E-F indicates an average wait time of 55-80+ seconds.




Improved Traffic Signals Option: This concept includes 4 traffic signals. There are currently 3 traffic signals. In this design, the traffic signal at CC street will be eliminated and replaced by a traffic signal at Millard ST. The intersections at Atlantic and Pacific would be upgraded with additional lanes. A new traffic signal would be added at Buckeye/Goerig/Lakeshore. There is also a direct connection from the Northbound offramp to CC ST.




Roundabout Option: This concept includes a series of three roundabouts. There is also a direct connection from the Northbound offramp to CC ST.
Click the "NEXT" icon to proceed to the survey

Create Your Signature

Please fill in your name and email and then either draw or type your signature below.

x

Signature Type

Type Draw Upload Custom
Clear Signature

Signature will be applied to the page. You will have a chance to review after signing.

Check this box to continue

x

Additional Signatures Required